What's being demonstrated
Most operators check NERC Cat 2 against the solar nameplate only. The aggregate rule (≥20 MVA at ≥60 kV at the common POI) catches DC-coupled hybrids that wouldn't trip on either component alone.
Is Bayside Commerce Center subject to NERC Cat 2 IBR registration?
Step 1 / 6· Press Space or → to advance